Skip to content

How To Hook Up a Whole House Generator

Blog
Generators
banner data-lazy-src=

At Bo’s Electric, we understand how important it is to have a reliable power source, especially during unexpected outages. That’s why we specialize in installing whole-house backup generators, ensuring your home remains powered, safe, and comfortable no matter the circumstances. In this guide, we’ll walk you through our approach to professionally installing a whole-house generator, so you know exactly what to expect from our service.

2. Safety Precautions Before Installation

Before we begin the installation process, safety is our top priority. Our certified technicians follow strict safety protocols to protect your home and family and ensure compliance with all local building codes and regulations. Here’s how we prepare to safely install your whole-house backup generator:

  • Adherence to Local Codes and Regulations: We begin by reviewing your local building codes and obtaining the necessary permits. Our team ensures that every aspect of the installation complies with all relevant electrical, zoning, and environmental regulations to provide a safe and legal setup.
  • Proper Placement and Ventilation: Proper placement is crucial for safety and performance. We carefully select a location for the generator that is a safe distance from your home, windows, doors, and any potential ignition sources. Adequate ventilation is essential to prevent dangerous carbon monoxide buildup, so we ensure the generator is installed in an open, well-ventilated area.
  • Grounding and Electrical Safety: To prevent electrical hazards, we ensure the generator is properly grounded according to the manufacturer’s specifications and local codes. This includes installing a grounding rod if necessary and connecting it to the generator’s frame.
  • Carbon Monoxide Precautions: Our team takes extra precautions to prevent carbon monoxide exposure. This includes selecting an outdoor location that minimizes the risk of exhaust gases entering the home and providing clear instructions for safe operation.
  • Personal Protective Equipment (PPE) and Tools: Our technicians are equipped with the necessary PPE, such as gloves, safety glasses, and ear protection, and use specialized tools to complete the installation safely and efficiently.

By following these safety measures, we guarantee a secure installation process that prioritizes your family’s well-being and peace of mind.

3. Choosing the Right Location

Selecting the right location for your whole-house backup generator is a critical step that ensures both safety and optimal performance. At Bo’s Electric, our experienced technicians consider several factors to determine the best placement for your generator:

  • Distance from the House: We position the generator at a safe distance from your home to prevent exhaust fumes from entering living spaces. Typically, this means placing the generator at least five feet from any exterior wall, but we always comply with the specific requirements of local codes.
  • Clearance from Windows and Doors: We maintain adequate clearance from windows, doors, vents, and other openings to minimize the risk of carbon monoxide entering the home. This also helps to reduce noise levels inside the house.
  • Compliance with Local Regulations: Our team is familiar with local regulations governing generator placement. We take into account property lines, flood zones, and other factors that may affect where the generator can be safely and legally installed.
  • Accessibility for Maintenance: We select a location that allows easy access for routine maintenance and repairs. This ensures that your generator can be serviced regularly to keep it running smoothly for years to come.
  • Considerations Based on Fuel Type: Whether you choose a propane or gas generator, we consider the fuel type in our placement decision. Propane generators, for example, need to be installed close enough to the propane tank to allow for a safe and effective connection. For gas generators, we ensure proximity to the gas meter while maintaining safety clearance.

By carefully evaluating these factors, we ensure that your generator is positioned in the safest, most effective location, ready to provide uninterrupted power when you need it most.

4. Preparing for Installation

At Bo’s Electric, we take a comprehensive approach to prepare your home for a whole-house backup generator installation. Our preparation process ensures everything is in place for a smooth and efficient installation:

  • Securing Necessary Permits and Approvals: Before we start, we handle all the paperwork for you. Our team will apply for and secure any necessary permits and approvals required by your local municipality. This step is crucial to ensure compliance with local building codes and regulations, avoiding any future issues or fines.
  • Site Preparation: To ensure a stable and secure foundation for your generator, we prepare the site by installing a concrete pad. The pad provides a level, durable surface that can withstand the weight and vibrations of the generator. We carefully select the location of the pad based on the considerations discussed earlier, ensuring compliance with local regulations and optimal placement for safety and accessibility.
  • Fuel Supply Setup: Depending on your choice of a propane or gas generator, we will coordinate with your fuel provider to set up a safe and reliable fuel supply. For propane generators, this involves installing a fuel line from your propane tank to the generator. For gas generators, we connect the generator to your home’s natural gas line, following all safety standards and local codes. We ensure that all connections are secure, leak-free, and properly inspected.
  • Electrical System Preparation: Our certified electricians will assess your home’s existing electrical system to prepare it for generator integration. This includes evaluating the main electrical panel, determining the best location for the automatic transfer switch, and planning the wiring route between the generator, transfer switch, and main panel. We also verify that the electrical load requirements are compatible with the generator’s capacity to ensure reliable performance during power outages.

By thoroughly preparing the site, securing permits, and setting up fuel and electrical connections, we ensure a safe and efficient installation that minimizes disruptions and maximizes your home’s readiness for uninterrupted power.

5. Step-by-Step Guide to Hooking Up a Whole-House Backup Generator

At Bo’s Electric, our experienced technicians follow a detailed, step-by-step process to install your whole-house backup generator correctly and safely:

  • Step 1: Position and Secure the Generator
    We start by positioning the generator on the pre-installed concrete pad. The generator is anchored securely to the pad using heavy-duty bolts to prevent movement due to vibrations or severe weather. We verify that the placement meets all local code requirements for distance and clearance.
  • Step 2: Connect the Fuel Supply Line
    Depending on your generator type, we will connect the fuel supply line:
    • For propane generators, we run a fuel line from your existing propane tank to the generator. This line is installed with proper fittings and regulators to ensure a safe and efficient fuel flow.
    • For gas generators, we connect the generator to your home’s natural gas line. Our team follows all local codes and safety protocols to prevent leaks or hazards, conducting pressure tests to confirm the integrity of the connection.
  • Step 3: Install the Automatic Transfer Switch
    The automatic transfer switch (ATS) is a critical component that automatically transfers your home’s power source from the utility to the generator during an outage. We install the ATS adjacent to your main electrical panel and connect it according to the manufacturer’s specifications. The ATS is wired to communicate directly with the generator, ensuring seamless activation when the utility power fails.
  • Step 4: Wire the Generator to the Transfer Switch and Electrical System
    Our certified electricians connect the generator to the ATS and integrate it with your home’s electrical system. This involves running conduit and wiring between the generator, the ATS, and the main electrical panel. We ensure that all connections are secure and meet electrical safety standards. The wiring is tested for continuity, and any necessary adjustments are made to match the generator’s output capacity with your home’s electrical needs.
  • Step 5: Test the Generator for Proper Operation
    After completing the installation, we perform a comprehensive test to ensure everything functions correctly. We simulate a power outage to check if the generator starts automatically and supplies power to the home as intended. This test verifies that the transfer switch operates correctly, the fuel supply is stable, and the generator runs smoothly. We also inspect for any unusual noises, vibrations, or emissions to ensure safe operation.

By following this meticulous installation process, we ensure your whole-house backup generator is set up correctly and ready to provide reliable power whenever needed.

6. Post-Installation Checklist and Maintenance Tips

Once the installation is complete, we take several steps to ensure everything is set up correctly and provide you with guidance on maintaining your new generator:

  • Verification of Installation Steps:
    We review all installation steps to confirm that each component has been installed properly and adheres to local building codes and manufacturer guidelines. This includes checking the generator’s placement, fuel connections, electrical wiring, and the operation of the automatic transfer switch.
  • Initial Maintenance Check:
    Our team performs an initial maintenance check to ensure that the generator is in optimal condition. This includes inspecting the oil level, coolant, battery, and fuel system. We provide a schedule for regular maintenance to keep your generator running efficiently and prevent unexpected issues.
  • Customer Walkthrough and Operation Instructions:
    We walk you through the entire setup, explaining how the generator works, how to perform basic checks, and what to do in case of an emergency. We provide detailed instructions on how to operate the generator, including how to start and stop it manually, check fuel levels, and understand the indicator lights and alerts.
  • Routine Maintenance:
    To keep your generator in peak condition, we recommend our maintenance service. We offer comprehensive maintenance plans to keep your whole-house generator in peak condition year-round. With options for 1-year, 3-year, or 5-year coverage, our plans provide the regular inspections and services needed to ensure reliable performance when you need it most. Plus, our advanced OmniMetrix monitoring system allows you to check your generator’s status anytime, anywhere, giving you complete control and peace of mind.

Protect your investment and guarantee your backup power is always ready – contact us today to learn more about our maintenance plans and find the one that best suits your needs.

For over 50 years, Bo’s Electric has been a trusted name in providing reliable whole-house generator installations. Our decades of experience mean we’ve encountered and expertly handled every challenge, ensuring that our customers have peace of mind with a reliable backup power solution tailored to their needs.

Ready to get started? Contact us today to schedule your consultation and learn how we can keep your home powered, no matter what comes your way.